          • Seven Stars Coating Project

            Seven Stars Coating Project
              The first bid of Meishan Qixing Tu Enclosure Project in Beilun District is to build 4100 meters new seawall, North drainage gate and diversion reef gate. The construction time is 008.2-2012.4, and the project cost is about 150 million yuan. The engineering grade is grade III, the main buildings such as embankments and sluices are grade 3, and the damp-proof standard of seawall is once in 50 years.
            • Drainage Project of Chaotang River

              Drainage Project of Chaotang River
                The Chaotang River Drainage Project in Cixi City is a key project in Ningbo City. The project covers 9.4 kilometers from Shuiyunpu in the east to Yangshan Lujiang in the west. The second tender section is the river channel dredging from Sanzao to Liuzaojiang (river pile No. B2+000-B2+900) in Chaotang Jiangxi Province and the related bridges and forks along the river. The project was awarded the Ningbo Water Resources Civilization Standardization Site in 2016, the Ministry of Water Resources Civilization Standardization Site in 2016 and Yongjiang Construction Cup in 2017.
              • Pumping Station Project of Interregional Water Transfer in Luzhong Bay

                Pumping Station Project of Interregional Water Transfer in Luzhong Bay
                  Cixi Luzhongwan Inter-regional Water Transfer Pumping Station Project includes the construction of management facilities such as pump house civil engineering, restraint Sluice Reconstruction and expansion, management room and installation of electromechanical equipment (including warehousing, storage and operation), etc. The design flow of pump station is 20 m/s.
                • Zhengxu Reservoir

                  Zhengxu Reservoir
                    The third tender of Zhengxu Reservoir Phase I Project in Cixi City covers an area of 10,000 mu, with a total reservoir capacity of 42.7 million M and Xingli reservoir capacity of 35 million M. The construction time is 2010.11.15-2013.05.31. The construction time of the second stage project is from 2011.12 to 2013.09. The project was awarded "Ningbo Water Conservancy Civilization Standardized Land in 2015", "Yongjiang Construction Cup in 2015" and "Dayu Award in 2015-2016".
                  中文内射亚洲人妻,亚州黄片视频在线观看,网站亚洲中文字幕av无码区,中文字幕AV免费三级片
                      1. <span id="r5jrl"><meter id="r5jrl"><font id="r5jrl"></font></meter></span>

                        <rp id="r5jrl"><optgroup id="r5jrl"></optgroup></rp>
                        国产成人精品综合| 孕妇动漫精品国产一区二区三区| 亚洲AV永久中文无码精品| 911天堂国产在线观看| 欧美日本亚欧在线观看| 在线观看无码精品永久网站| 深夜福利亚洲精品无码视频| 伊人色综合网久久天天| 多人电影无码在线观看| 国产三级在线精品区| 国产亚洲Av手机在线播放| 国产亚洲91精品| 免费观看在线观看日韩AV| 亚洲日本一区二区三区线| 亚洲综合久久一区二区| 免费观看AV一级毛片| 国产91资源午夜福利| 中文字幕在线资源站| 亚洲国产中文精品无码专区网站 |